Recent Projects

Engineers Australia Logo

Recent Projects

Granny Flat DA Approval

Council DA Approval for Granny Flat in Merrylands NSW

19 Boneffin Rd, Hunters Hill

boneffin image

MWM Engineers undertook construction assessment , design modification and prepare drawings for the three storied residential house development at Hunters Hill, NSW. 

Chasis and Brakes Monorail Assessment

chasis break project imageThe loop monorail at Chassis Brakes manufacturing factory located at 18-24 Abott Road, Seven Hills was redesigned in 1997. This monorail exhibits extensive corrosion in some places.

The monorail is currently operating to transport 5.1 tonnes SWL in different locations of the facility. Recently it appears that the monorail may have designed for a 8 tonnes safe working load. MWM was commissioned to determine the safe working loads of the monorail considering the wear and tear that took place in the past.

We undertook site visits, NDT test assessment and structural assessment of existing industrial shed for replacing the monorail.

Work Cover Project

workcover project imageMWM undertook the design verification of the Monorail systems for the Work Cover workshop at Londonderry, NSW. The project work includes the upgrade strategy of the existing monorails and subsequently supporting structures at the workshop building. MWM undertook design check for the building structures for the new monorail system in the building.

 

Our Address:

15 Cormorant Street

Marsden Park, NSW 2765

Working Hours:

Monday - Friday 9:00am-5:00pm

Saturday: 9:00am - 12:00pm

Contacts:

Mobile: 0433 851 761

email: This email address is being protected from spambots. You need JavaScript enabled to view it.